10 KLD Packaged STP at MCC School
The 10 KLD Sewage Treatment Plant (Hostel Block) at MCC School, Chennai, is a dedicated wastewater management solution engineered and executed by HECS. Designed as a Packaged Sewage Treatment Plant, the system supports the daily sewage load generated by nearly 80 hostel students. Built on reliable MBBR technology, the plant ensures steady treatment performance, low noise, and an odor-free environment—ideal for an active school campus. The compact FRP structure, quick installation timeline, and ease of operation allow MCC School to maintain hygiene while reusing treated water for gardening, reinforcing the institution’s commitment to sustainable practices.
The 10 KLD Sewage Treatment Plant (Hostel Block) at MCC School, Chennai, is a dedicated wastewater management solution engineered and executed by HECS. Designed as a Packaged Sewage Treatment Plant, the system supports the daily sewage load generated by nearly 80 hostel students. Built on reliable MBBR technology, the plant ensures steady treatment performance, low noise, and an odor-free environment—ideal for an active school campus. The compact FRP structure, quick installation timeline, and ease of operation allow MCC School to maintain hygiene while reusing treated water for gardening, reinforcing the institution’s commitment to sustainable practices.
Inauguration Highlight
“The installation of the 10 KLD Packaged Sewage Treatment Plant at MCC School, Chennai, marks a meaningful step toward improving environmental standards in educational institutions. I am pleased to inaugurate this modern STP system built by HECS, designed to support the hostel’s daily requirements while maintaining a clean and safe atmosphere for the students.
The school’s initiative in adopting MBBR-based treatment and reusing the treated water for gardening demonstrates a strong commitment to environmental responsibility. This is an encouraging example for other institutions to follow.”
— Thiru Siva. V. Meyyanathan
Honourable Minister – Government of Tamil Nadu
About MCC School
MCC School is one of Chennai’s oldest and most respected educational institutions with a proud legacy of over 135 years. With students from CBSE, IAS foundation programs, and senior secondary streams, the school focuses on providing hygienic, modern, and environmentally responsible facilities—especially within its hostel environment.
Project Summary
Parameter | Details |
| Client | MCC School, Chennai |
| Executed By | HECS – Hubert Enviro Care Systems |
| Capacity | 10 KLD |
| Technology Used | MBBR (Moving Bed Biofilm Reactor) |
| Model | Packaged FRP Sewage Treatment Plant |
| Installation Type | Above-Ground FRP Tank |
| Additional Infrastructure | Below-Ground Collection Tank |
| Project Duration | 60 Days |
| Beneficiaries | ~80 Hostel Students |
| Treated Water Usage | Gardening |
| Inlet Source | Sewage |
Project Overview
MCC School partnered with HECS to install a compact, reliable sewage treatment solution to support the daily load generated by its hostel students. The school required a system that was operationally simple, environmentally compliant, odour-free, and capable of producing treated water suitable for gardening purposes.
HECS engineered and commissioned a 10 KLD Packaged FRP Sewage Treatment Plant powered by MBBR technology, chosen for its stability, low maintenance, and adaptability to fluctuating loads commonly seen in hostels.
Key Challenges
- Requirement for a silent, low-odour system to maintain a healthy hostel environment
- Limited space availability within the school campus
- Treated water had to be safe for gardening
- Completion target set at 60 days
- Load variations due to differing student routines
HECS Solution
HECS delivered a 10 KLD MBBR-based Packaged FRP STP, designed for efficiency, durability, and ease of operation.
Solution Highlights
- Above-ground FRP tank for quick installation and easy access
- Below-ground collection tank for smooth inflow management
- MBBR media ensures consistent biological activity even during fluctuating hostel loads
- Pre-fabricated FRP modules reduced on-site work and enabled faster commissioning
- Simple operational procedures suitable for the school’s maintenance team
Client Testimonial
“The HECS Packaged STP has been a valuable addition to our campus infrastructure. The system operates smoothly, delivers clean treated water for our gardening needs, and has helped us maintain a hygienic environment for our hostel students. We appreciate the timely execution, quality of work, and the professional support offered by the HECS team throughout the project.”
— Mr. G. Jebadoss Thinakaran, Headmaster, MCC School (Chennai)
Performance & Benefits
- High treatment efficiency with stable MBBR operation
- Odor-free, hostel-friendly environment
- Low operational cost due to reduced manual involvement
- Treated water safely reused for gardening
- Supports MCC School’s eco-friendly and green campus initiatives
- Accessible design ensures easy maintenance and monitoring
Build a Greener Future – Connect with HECS Now!
Looking for reliable wastewater treatment solutions? Get expert guidance and find the perfect STP for your needs today!




