Packaged STP in Goa

In short: HECS designs, supplies and commissions factory-built FRP packaged STPs for sites in Goa, from about 1 to 1,000 KLD. At Alto Porvorim, a HECS 100 KLD packaged STP for SIDCGL sits below ground under a landscaped garden, and its treated water irrigates two nearby parks. Each plant is designed to the outlet limits in your Goa State Pollution Control Board (GSPCB) consent.

✓ GSPCB consents✓ Below ground under gardens✓ Treated water for parks
GOA STP
Porvorim STP site, Goa
100 KLD

SIDCGL STP, Alto Porvorim

Below ground

Under a landscaped garden

10-year

O&M contract at Porvorim

8.6 mg/l

BOD in the Nov 2025 sample (limit 10)

Case: 100 KLD STP for SIDCGL, Alto Porvorim

The Sewerage and Infrastructural Development Corporation of Goa Ltd (SIDCGL) needed to treat domestic wastewater from the LIG Housing Board Colony at Alto Porvorim. HECS designed, supplied and commissioned a 100 KLD packaged FRP STP with IoT-based monitoring.

  • Below ground: the plant sits under a landscaped garden, so the site stays usable.
  • Reuse: treated water is piped 120 m to Forest Park and 180 m to Science Park to keep the gardens green.
  • Monitoring: operators track performance and water quality on a mobile app.
  • Operation: HECS runs the plant under a 10-year O&M contract.
  • Inauguration: the plant was inaugurated by Shri Rohan Khaunte, Goa’s Minister of Tourism.

Read the Porvorim case study · Inauguration news

Goa Minister of Tourism inaugurating the HECS 100 KLD packaged STP at Porvorim, Goa
Goa's Tourism Minister inaugurating the HECS 100 KLD STP at Porvorim

Treated-water results at Porvorim

Results for a sample collected on 3 November 2025 (report dated 8 November 2025), against the limits in the plant’s GSPCB consent order:

ParameterResultConsent limit
pH6.815.5 – 9.0
BOD (3 days, 27 °C)8.60 mg/l≤ 10 mg/l
COD44.00 mg/l≤ 50 mg/l
TSS18.00 mg/l≤ 20 mg/l
Oil and grease2.40 mg/l≤ 10 mg/l
Ammoniacal nitrogen3.22 mg/l≤ 5 mg/l
Total nitrogen6.84 mg/l≤ 10 mg/l
Faecal coliform34 MPN/100 ml< 100 MPN/100 ml

Who needs an STP in Goa

MoEFCC’s environmental conditions for building bye-laws (9 December 2016) set the national baseline: buildings of 20,000 sq m and more must treat 100% of their wastewater on site and reuse the treated water, and buildings of 5,000 to 20,000 sq m need on-site treatment where no municipal sewer is available. GSPCB gives the Consent to Establish and Consent to Operate for the plant and sets the outlet limits.

Typical Goa sites include hotels and resorts, villas and housing colonies, hospitals, public buildings and parks, and commercial complexes. See our Goa State PCB STP guidelines and is an STP mandatory?.

Residential packaged sewage treatment plant
HECS FRP packaged STP

Why packaged STPs suit Goa

  • Coastal air and salt: FRP tanks do not rust, unlike steel tanks.
  • Tourist-season peaks: equalisation and MBBR biology handle swings in occupancy; extra modules can be added later.
  • Space: units can go below ground under gardens or parking, as at Porvorim.
  • Dry-season water: treated water can keep gardens and lawns green and supply flushing.
  • Less site work: factory-built units arrive tested; a HECS Ultima unit installs in about two days once the base is ready.

Compare HECS Ultima (MBBR) and HECS Amaze (MBR), or read FRP vs RCC STP.

From enquiry to a running plant

  1. Share the building type, users or KLD, location and your GSPCB consent (or the limits you expect).
  2. An HECS engineer sizes the plant and proposes an above- or below-ground layout.
  3. The FRP unit is built and tested in the HECS factory.
  4. The HECS civil team prepares the base or pit, inlet and outlet levels and power (or your own contractor, if you prefer).
  5. HECS delivers, places and connects the unit, then commissions it.
  6. Handover with operator training, then O&M or AMC with HECS SmartHub monitoring.
FAQs

Packaged STP in Goa: FAQs

Can’t find your answer? Ask an HECS engineer. We reply within minutes.

It depends on the size and use of the building and on your consent. Under MoEFCC’s December 2016 building conditions, buildings of 20,000 sq m or more must treat all their sewage on site and reuse it, and buildings of 5,000 to 20,000 sq m need on-site treatment where there is no sewer. The Goa State Pollution Control Board consent and your local body approval set the rules for your site.

The limits are written in your GSPCB consent order. For example, the consent for the 100 KLD STP at Porvorim sets BOD at 10 mg/l or less, COD at 50 mg/l or less, TSS at 20 mg/l or less and faecal coliform below 100 MPN/100 ml. Share your consent with us and the plant is designed to it.

Yes. The HECS 100 KLD STP for SIDCGL at Alto Porvorim sits below ground under a landscaped garden. Below-ground units need a pit, a base designed for the groundwater level, and access for maintenance and sludge removal.

An equalisation tank evens out the daily and seasonal peaks, and MBBR biology copes well with changing loads. Size the plant on full occupancy and plan extra modules if the property will grow.

HECS offers O&M and AMC contracts with HECS SmartHub remote monitoring. At Porvorim, HECS operates and maintains the plant under a 10-year contract.

Yes, for gardens, flushing and cooling, after filtration and disinfection. At Porvorim, treated water is piped to irrigate the Science Park and Forest Park gardens.

Plan a packaged STP for your Goa site

Share the building type, users or KLD, location and reuse plans. Our team replies within minutes.

Packaged Sewage Treatment Plant in Goa