In short: a 10 KLD sewage treatment plant treats 10,000 litres of sewage a day. That is about 93 residents (roughly 19 flats), using NBC 2016 water figures. HECS supplies factory-built FRP packaged STPs in this size with MBBR (HECS Ultima) or MBR (HECS Amaze) treatment, installed above or below ground, typically 4 to 6 weeks from order to commissioning.

✓ About 90 residents✓ MBBR or MBR✓ 4–6 weeks to commission
HECS 10 KLD packaged STP at the Kalaignar Memorial, Chennai
HECS 10 KLD packaged STP at the Kalaignar Memorial, Chennai
10,000 L

Sewage treated per day

~90

Residents (NBC 2016)

4–6 weeks

Order to commissioning

~2 days

Ultima install once base is ready

Who a 10 KLD STP suits

Approximate users for 10 KLD, using NBC 2016 water use per person and sewage at 80% of water:

Building typeWater use (NBC 2016)Approx. users for 10 KLD
Apartments and housing135 L per person a day93 residents (~19 flats)
Offices and IT parks45 L per person a day278 staff
Day schools and colleges45 L per student a day278 students
Hotels (with lodging)180 L per bed a day69 beds (plus staff)
Hospitals340 L per bed a day (up to 100 beds)37 beds

These are first estimates. Use the capacity calculator or read how to calculate STP capacity, and HECS confirms the final size after checking peak flow.

10 KLD Packaged STP at MCC School
HECS 10 KLD STP at MCC School, Chennai

MBBR or MBR at 10 KLD

HECS Ultima (MBBR)HECS Amaze (MBR)
Best forApartments, schools, offices and factories with typical discharge or garden reuseSites that reuse water for flushing or cooling, have strict limits or little space
Treated waterMeets typical discharge limits with filtration and disinfectionHigh clarity, suited to non-potable reuse
BodyLeak-proof FRPCompact FRP unit
MonitoringIoT remote monitoring with HECS SmartHubIoT-enabled monitoring and control

Compare them in MBBR vs MBR vs SBR, or see FRP vs RCC STP.

Residential packaged sewage treatment plant
HECS FRP packaged STP at the HECS factory

What is included

  • Design and sizing by HECS engineers, with layout for above- or below-ground installation.
  • Factory-built FRP unit, built and tested at the HECS factory near Chennai.
  • Civil work (base or pit) by the HECS team, or by the client if preferred.
  • Installation and commissioning, typically 4 to 6 weeks from order.
  • HECS SmartHub remote monitoring, with O&M and AMC options.

Footprint, power rating and price are confirmed in the layout and quotation for your site.

Real HECS projects in this size range

  • 10 KLD packaged STP at the Kalaignar Memorial, Chennai. Case study
  • 10 KLD STP at MCC School, Chennai: treated water reused for gardening. Case study
  • 6 KLD STP with a 20 KLD ETP at Global Pharma: a smaller STP alongside effluent treatment. Case study
FAQs

10 KLD packaged STP: FAQs

Can’t find your answer? Ask an HECS engineer. We reply within minutes.

About 93 residents (roughly 19 flats at 5 people each), using NBC 2016’s 135 litres per person a day and sewage at 80% of water use. Offices and day schools use far less water per person, so the same plant serves about 278 staff or students.

Size on your real daily flow plus a margin for peaks and growth. If your calculation lands close to 10 KLD, HECS checks peak hours, future expansion and reuse plans before recommending the next size up or down.

There is no fixed price list. The price depends on technology (MBBR or MBR), treated-water quality, above- or below-ground installation, civil scope and automation. HECS sends a quotation after sizing; see the STP cost guide for what drives the price.

Order to commissioning typically takes 4 to 6 weeks. A HECS Ultima unit is installed in about two days once the base or pit is ready. Civil work (base or pit) is done by the HECS team, or by the client if preferred.

Footprint and power depend on the model, technology and layout chosen for your site. HECS confirms the exact space, power rating and electrical load in the layout and quotation.

For about 18 to 20 flats, yes, depending on occupancy and water use. Larger blocks, or blocks planning reuse for flushing, may need the next size. Under MoEFCC’s 2016 building conditions, buildings of 20,000 sq m or more must treat all sewage on site; see is an STP mandatory?.