In short: a 50 KLD sewage treatment plant treats 50,000 litres of sewage a day. That is about 463 residents (roughly 93 flats), using NBC 2016 water figures. HECS supplies factory-built FRP packaged STPs in this size with MBBR (HECS Ultima) or MBR (HECS Amaze) treatment, installed above or below ground, typically 4 to 6 weeks from order to commissioning.
Sewage treated per day
Residents (NBC 2016)
Order to commissioning
HECS SmartHub monitoring
Who a 50 KLD STP suits
Approximate users for 50 KLD, using NBC 2016 water use per person and sewage at 80% of water:
| Building type | Water use (NBC 2016) | Approx. users for 50 KLD |
|---|---|---|
| Apartments and housing | 135 L per person a day | 463 residents (~93 flats) |
| Offices and IT parks | 45 L per person a day | 1,389 staff |
| Day schools and colleges | 45 L per student a day | 1,389 students |
| Hotels (with lodging) | 180 L per bed a day | 347 beds (plus staff) |
| Hospitals | 450 L per bed a day (over 100 beds) | 139 beds |
These are first estimates. Use the capacity calculator or read how to calculate STP capacity, and HECS confirms the final size after checking peak flow.
MBBR or MBR at 50 KLD
| HECS Ultima (MBBR) | HECS Amaze (MBR) | |
|---|---|---|
| Best for | Apartments, schools, offices and factories with typical discharge or garden reuse | Sites that reuse water for flushing or cooling, have strict limits or little space |
| Treated water | Meets typical discharge limits with filtration and disinfection | High clarity, suited to non-potable reuse |
| Body | Leak-proof FRP | Compact FRP unit |
| Monitoring | IoT remote monitoring with HECS SmartHub | IoT-enabled monitoring and control |
Compare them in MBBR vs MBR vs SBR, or see FRP vs RCC STP.
What is included
- Design and sizing by HECS engineers, with layout for above- or below-ground installation.
- Factory-built FRP unit, built and tested at the HECS factory near Chennai.
- Civil work (base or pit) by the HECS team, or by the client if preferred.
- Installation and commissioning, typically 4 to 6 weeks from order.
- HECS SmartHub remote monitoring, with O&M and AMC options.
Footprint, power rating and price are confirmed in the layout and quotation for your site.
Real HECS projects in this size range
- 50 KLD Ultima+ smart STP at Lords 83, Wayanad (Kerala): MBBR with ultrafiltration and HECS SmartHub; treated water reused for gardens, pathways and flushing. Kerala page
- 30 KLD Ultima+ smart STP at Interarch Building Products. Case study
50 KLD packaged STP: FAQs
Can’t find your answer? Ask an HECS engineer. We reply within minutes.
How many people does a 50 KLD STP serve?
About 463 residents (roughly 93 flats at 5 people each), using NBC 2016’s 135 litres per person a day and sewage at 80% of water use. Offices and day schools use far less water per person, so the same plant serves about 1,389 staff or students.
Should I buy exactly 50 KLD?
Size on your real daily flow plus a margin for peaks and growth. If your calculation lands close to 50 KLD, HECS checks peak hours, future expansion and reuse plans before recommending the next size up or down.
How much does a 50 KLD packaged STP cost?
There is no fixed price list. The price depends on technology (MBBR or MBR), treated-water quality, above- or below-ground installation, civil scope and automation. HECS sends a quotation after sizing; see the STP cost guide for what drives the price.
How long does installation take?
Order to commissioning typically takes 4 to 6 weeks. A HECS Ultima unit is installed in about two days once the base or pit is ready. Civil work (base or pit) is done by the HECS team, or by the client if preferred.
How much space and power does a 50 KLD plant need?
Footprint and power depend on the model, technology and layout chosen for your site. HECS confirms the exact space, power rating and electrical load in the layout and quotation.
Is 50 KLD a common size for apartments and hotels?
Yes. It suits roughly 90 flats, a mid-size hotel or resort, or an office campus of about 1,400 staff. Resorts with seasonal occupancy often add an equalisation tank to even out peaks.
Get a 50 KLD packaged STP quote
Share your building type, number of users or flats, location and reuse plans. Our team replies within minutes.