50 KLD packaged STP

In short: a 50 KLD sewage treatment plant treats 50,000 litres of sewage a day. That is about 463 residents (roughly 93 flats), using NBC 2016 water figures. HECS supplies factory-built FRP packaged STPs in this size with MBBR (HECS Ultima) or MBR (HECS Amaze) treatment, installed above or below ground, typically 4 to 6 weeks from order to commissioning.

✓ About 460 residents✓ MBBR or MBR✓ 4–6 weeks to commission
HECS 50 KLD smart STP at the Lords 83 resort, Wayanad
HECS 50 KLD smart STP at the Lords 83 resort, Wayanad
50,000 L

Sewage treated per day

~460

Residents (NBC 2016)

4–6 weeks

Order to commissioning

IoT

HECS SmartHub monitoring

Who a 50 KLD STP suits

Approximate users for 50 KLD, using NBC 2016 water use per person and sewage at 80% of water:

Building typeWater use (NBC 2016)Approx. users for 50 KLD
Apartments and housing135 L per person a day463 residents (~93 flats)
Offices and IT parks45 L per person a day1,389 staff
Day schools and colleges45 L per student a day1,389 students
Hotels (with lodging)180 L per bed a day347 beds (plus staff)
Hospitals450 L per bed a day (over 100 beds)139 beds

These are first estimates. Use the capacity calculator or read how to calculate STP capacity, and HECS confirms the final size after checking peak flow.

Smart PSTP
HECS 50 KLD Ultima+ smart STP, Lords 83

MBBR or MBR at 50 KLD

HECS Ultima (MBBR)HECS Amaze (MBR)
Best forApartments, schools, offices and factories with typical discharge or garden reuseSites that reuse water for flushing or cooling, have strict limits or little space
Treated waterMeets typical discharge limits with filtration and disinfectionHigh clarity, suited to non-potable reuse
BodyLeak-proof FRPCompact FRP unit
MonitoringIoT remote monitoring with HECS SmartHubIoT-enabled monitoring and control

Compare them in MBBR vs MBR vs SBR, or see FRP vs RCC STP.

HECS 30 KLD Ultima+ Smart STP at Interarch Building Products
HECS 30 KLD Ultima+ smart STP at Interarch Building Products

What is included

  • Design and sizing by HECS engineers, with layout for above- or below-ground installation.
  • Factory-built FRP unit, built and tested at the HECS factory near Chennai.
  • Civil work (base or pit) by the HECS team, or by the client if preferred.
  • Installation and commissioning, typically 4 to 6 weeks from order.
  • HECS SmartHub remote monitoring, with O&M and AMC options.

Footprint, power rating and price are confirmed in the layout and quotation for your site.

Real HECS projects in this size range

  • 50 KLD Ultima+ smart STP at Lords 83, Wayanad (Kerala): MBBR with ultrafiltration and HECS SmartHub; treated water reused for gardens, pathways and flushing. Kerala page
  • 30 KLD Ultima+ smart STP at Interarch Building Products. Case study
FAQs

50 KLD packaged STP: FAQs

Can’t find your answer? Ask an HECS engineer. We reply within minutes.

About 463 residents (roughly 93 flats at 5 people each), using NBC 2016’s 135 litres per person a day and sewage at 80% of water use. Offices and day schools use far less water per person, so the same plant serves about 1,389 staff or students.

Size on your real daily flow plus a margin for peaks and growth. If your calculation lands close to 50 KLD, HECS checks peak hours, future expansion and reuse plans before recommending the next size up or down.

There is no fixed price list. The price depends on technology (MBBR or MBR), treated-water quality, above- or below-ground installation, civil scope and automation. HECS sends a quotation after sizing; see the STP cost guide for what drives the price.

Order to commissioning typically takes 4 to 6 weeks. A HECS Ultima unit is installed in about two days once the base or pit is ready. Civil work (base or pit) is done by the HECS team, or by the client if preferred.

Footprint and power depend on the model, technology and layout chosen for your site. HECS confirms the exact space, power rating and electrical load in the layout and quotation.

Yes. It suits roughly 90 flats, a mid-size hotel or resort, or an office campus of about 1,400 staff. Resorts with seasonal occupancy often add an equalisation tank to even out peaks.

Get a 50 KLD packaged STP quote

Share your building type, number of users or flats, location and reuse plans. Our team replies within minutes.

50 KLD Packaged Sewage Treatment Plant