100 KLD packaged STP

In short: a 100 KLD sewage treatment plant treats 1,00,000 litres of sewage a day. That is about 926 residents (roughly 185 flats), using NBC 2016 water figures. HECS supplies factory-built FRP packaged STPs in this size with MBBR (HECS Ultima) or MBR (HECS Amaze) treatment, installed above or below ground, typically 4 to 6 weeks from order to commissioning.

✓ About 925 residents✓ Modular FRP units✓ 4–6 weeks to commission
Goa Minister of Tourism inaugurating the HECS 100 KLD packaged STP at Porvorim, Goa
HECS 100 KLD packaged STP at Porvorim, Goa
1,00,000 L

Sewage treated per day

~925

Residents (NBC 2016)

Below ground

Porvorim 100 KLD under a garden

10-year

O&M contract at Porvorim

Who a 100 KLD STP suits

Approximate users for 100 KLD, using NBC 2016 water use per person and sewage at 80% of water:

Building typeWater use (NBC 2016)Approx. users for 100 KLD
Apartments and housing135 L per person a day926 residents (~185 flats)
Offices and IT parks45 L per person a day2,778 staff
Day schools and colleges45 L per student a day2,778 students
Hotels (with lodging)180 L per bed a day694 beds (plus staff)
Hospitals450 L per bed a day (over 100 beds)278 beds

These are first estimates. Use the capacity calculator or read how to calculate STP capacity, and HECS confirms the final size after checking peak flow.

GOA STP
Porvorim STP site, Goa

MBBR or MBR at 100 KLD

HECS Ultima (MBBR)HECS Amaze (MBR)
Best forApartments, schools, offices and factories with typical discharge or garden reuseSites that reuse water for flushing or cooling, have strict limits or little space
Treated waterMeets typical discharge limits with filtration and disinfectionHigh clarity, suited to non-potable reuse
BodyLeak-proof FRPCompact FRP unit
MonitoringIoT remote monitoring with HECS SmartHubIoT-enabled monitoring and control

Compare them in MBBR vs MBR vs SBR, or see FRP vs RCC STP.

40 KLD Packaged ETP Installation
HECS packaged FRP unit installation

What is included

  • Design and sizing by HECS engineers, with layout for above- or below-ground installation.
  • Factory-built FRP unit, built and tested at the HECS factory near Chennai.
  • Civil work (base or pit) by the HECS team, or by the client if preferred.
  • Installation and commissioning, typically 4 to 6 weeks from order.
  • HECS SmartHub remote monitoring, with O&M and AMC options.

Footprint, power rating and price are confirmed in the layout and quotation for your site.

Real HECS projects in this size range

  • 100 KLD packaged STP for SIDCGL at Alto Porvorim, Goa: installed below ground under a landscaped garden; treated water irrigates nearby parks; operated by HECS under a 10-year O&M contract. Goa page
  • 1 MLD (1,000 KLD) FRP-based ETP at the ONGC field, Gopavaram, Andhra Pradesh: shows HECS’s larger-capacity FRP work. Case study
FAQs

100 KLD packaged STP: FAQs

Can’t find your answer? Ask an HECS engineer. We reply within minutes.

About 926 residents (roughly 185 flats at 5 people each), using NBC 2016’s 135 litres per person a day and sewage at 80% of water use. Offices and day schools use far less water per person, so the same plant serves about 2,778 staff or students.

Size on your real daily flow plus a margin for peaks and growth. If your calculation lands close to 100 KLD, HECS checks peak hours, future expansion and reuse plans before recommending the next size up or down.

There is no fixed price list. The price depends on technology (MBBR or MBR), treated-water quality, above- or below-ground installation, civil scope and automation. HECS sends a quotation after sizing; see the STP cost guide for what drives the price.

Order to commissioning typically takes 4 to 6 weeks. A HECS Ultima unit is installed in about two days once the base or pit is ready. Civil work (base or pit) is done by the HECS team, or by the client if preferred.

Footprint and power depend on the model, technology and layout chosen for your site. HECS confirms the exact space, power rating and electrical load in the layout and quotation.

Yes. Larger capacities can be built as more than one FRP module, which helps with phased occupancy and lets one module keep running during maintenance. HECS confirms the module split in the layout.