200 KLD packaged STP

In short: a 200 KLD sewage treatment plant treats 2,00,000 litres of sewage a day. That is about 1,852 residents (roughly 370 flats), using NBC 2016 water figures. HECS supplies factory-built FRP packaged STPs at this capacity as one or more modules, with MBBR (HECS Ultima) or MBR (HECS Amaze) treatment, installed above or below ground, typically 4 to 6 weeks from order to commissioning.

✓ About 1,850 residents✓ Modular FRP units✓ 4–6 weeks to commission
GOA STP
Porvorim STP site, Goa
2,00,000 L

Sewage treated per day

~1,850

Residents (NBC 2016)

Modular

Two or more FRP units

4–6 weeks

Order to commissioning

Who a 200 KLD STP suits

Approximate users for 200 KLD, using NBC 2016 water use per person and sewage at 80% of water:

Building typeWater use (NBC 2016)Approx. users for 200 KLD
Apartments and housing135 L per person a day1,852 residents (~370 flats)
Offices and IT parks45 L per person a day5,556 staff
Day schools and colleges45 L per student a day5,556 students
Hotels (with lodging)180 L per bed a day1,389 beds (plus staff)
Hospitals450 L per bed a day (over 100 beds)556 beds

These are first estimates. Use the capacity calculator or read how to calculate STP capacity, and HECS confirms the final size after checking peak flow. Other sizes: 10 KLD, 20 KLD, 30 KLD, 50 KLD, 100 KLD, 500 KLD.

Goa Minister of Tourism inaugurating the HECS 100 KLD packaged STP at Porvorim, Goa
HECS 100 KLD packaged STP at Porvorim, Goa

MBBR or MBR at 200 KLD

HECS Ultima (MBBR)HECS Amaze (MBR)
Best forApartments, schools, offices and factories with typical discharge or garden reuseSites that reuse water for flushing or cooling, have strict limits or little space
Treated waterMeets typical discharge limits with filtration and disinfectionHigh clarity, suited to non-potable reuse
BodyLeak-proof FRPCompact FRP unit
MonitoringIoT remote monitoring with HECS SmartHubIoT-enabled monitoring and control

Compare them in MBBR vs MBR vs SBR, or see FRP vs RCC STP.

HECS packaged FRP treatment plants at the HECS factory
HECS FRP packaged STP tanks at the HECS factory

What is included

  • Design and sizing by HECS engineers, with layout for above- or below-ground installation.
  • Factory-built FRP modules, built and tested at the HECS factory near Chennai.
  • Civil work (base or pit) by the HECS team, or by the client if preferred.
  • Installation and commissioning, typically 4 to 6 weeks from order.
  • HECS SmartHub remote monitoring, with O&M and AMC options.

Footprint, power rating and price are confirmed in the layout and quotation for your site.

Real HECS projects in this size range

  • 100 KLD packaged STP for SIDCGL at Alto Porvorim, Goa: installed below ground under a landscaped garden; operated by HECS under a 10-year O&M contract. Case study
  • 1 MLD (1,000 KLD) FRP-based ETP at the ONGC field, Gopavaram, Andhra Pradesh: HECS’s larger-capacity FRP work. Case study
  • 50 KLD Ultima+ smart STP at Lords 83, Wayanad (Kerala): MBBR with ultrafiltration; treated water reused for gardens, pathways and flushing. Case study

Other packaged STP sizes

Not sure 200 KLD is right? Compare other HECS packaged STP capacities, or use the sewage calculator to size your plant.

FAQs

200 KLD packaged STP: FAQs

Can’t find your answer? Ask an HECS engineer. We reply within minutes.

About 1,852 residents (roughly 370 flats at 5 people each), using NBC 2016’s 135 litres per person a day and sewage at 80% of water use. Offices and day schools use far less water per person, so the same plant serves about 5,556 staff or students.

Size on your real daily flow plus a margin for peaks and growth. If your calculation lands close to 200 KLD, HECS checks peak hours, future expansion and reuse plans before recommending the next size up or down.

There is no fixed price list. The price depends on technology (MBBR or MBR), treated-water quality, above- or below-ground installation, civil scope and automation. HECS sends a quotation after sizing; see the STP cost guide for what drives the price.

Order to commissioning typically takes 4 to 6 weeks. Civil work (base or pit) is done by the HECS team, or by the client if preferred. Larger plants built as several modules are scheduled module by module in the project plan.

Footprint and power depend on the model, technology and layout chosen for your site. HECS confirms the exact space, power rating and electrical load in the layout and quotation.

Yes. A 200 KLD capacity can be built as more than one FRP module, for example two 100 KLD units. This suits phased occupancy and lets one module keep running during maintenance. HECS confirms the split in the layout.

Very likely. Under MoEFCC’s 2016 building conditions, buildings of 20,000 sq m or more must treat all sewage on site and reuse it. Your building approval and consent set the exact rules; see is an STP mandatory?.

Get a 200 KLD packaged STP quote

Share your building type, number of users or flats, location and reuse plans. Our team replies within minutes.

200 KLD Packaged Sewage Treatment Plant