STP plant manufacturer · Tamil Nadu

In short: HECS (Hubert Enviro Care Systems) is a packaged STP manufacturer based in Guindy, Chennai, with its factory at Sriperumbudur. Since 1997 we have worked in sewage treatment. We design, build, install and maintain factory-built FRP sewage treatment plants, MBBR (HECS Ultima) and MBR (HECS Amaze), from about 1 to 1,000 KLD for apartments, hospitals, hotels, schools, offices and factories across Tamil Nadu, designed to the outlet limits in your TNPCB consent.

✓ Factory at Sriperumbudur✓ MBBR and MBR✓ TNPCB consents
HECS packaged sewage treatment plant (FRP unit) installed in Tamil Nadu
HECS packaged STP (FRP unit) installed in Tamil Nadu
Since 1997

In sewage treatment

1–1,000 KLD

Packaged STP range

~2 days

To install a HECS Ultima unit

Minutes

Typical reply to enquiries

HECS at a glance

CompanyHubert Enviro Care Systems (HECS)
In sewage treatment since1997
Head officeA21, 3rd Phase, TVK Industrial Estate, Guindy, Chennai 600032
FactorySriperumbudur, near Chennai
Packaged STPsHECS Ultima (MBBR) and HECS Amaze (MBR), factory-built FRP units
CapacityAbout 1 to 1,000 KLD; larger sites with multiple units
InstallationAbove or below ground
MonitoringHECS SmartHub IoT alerts and dashboards
After-salesO&M and AMC contracts
Contact+91 73580 51767 · WhatsApp +91 84388 64070 · [email protected]

What is a packaged STP and how does it work?

A packaged sewage treatment plant is a complete STP built and tested in a factory and delivered as one or more units, so site work is mainly the base or pit and connections. Sewage passes through these stages:

  1. Screening: removes rags, plastics and grit.
  2. Equalisation: evens out morning and evening peaks.
  3. Biological treatment: bacteria break down BOD and COD, on moving media (MBBR) or with membranes (MBR).
  4. Settling or membrane separation: separates clean water from sludge.
  5. Filtration and disinfection: polishes the water for discharge or reuse.
  6. Sludge handling: excess sludge is stored and removed.
HECS Ultima Series packaged STP process diagram: screening, anoxic, aerobic MBBR and settling chambers, filter skid and disinfection
HECS Ultima (MBBR) process stages

Choose the technology

HECS Ultima (MBBR)HECS Amaze (MBR)
Best forApartments, schools, offices, factory sewageFlushing or cooling reuse, strict limits, tight space
Treated waterMeets typical discharge limits with filtration and disinfectionDesigned for BOD and TSS below 5 mg/l
RunningTypically 1–2 hours of attention a week at small and mid sizes; below 50 dBMembranes need regular cleaning and eventual replacement
InstallationAbove or below ground; a unit installs in about two daysAbove or below ground

Product pages: HECS Ultima · HECS Amaze · HECS SmartHub. Compare in MBBR vs MBR vs SBR and FRP vs RCC STP.

STP plants for every type of site

Apartments and gated communities

Sized on flats and residents, with reuse for flushing and gardens.

Commercial buildings and IT parks

Compact plants for offices, malls and IT parks, with cooling-tower reuse.

Hotels and resorts

Low odour and noise, sized for guests and staff.

Hospitals

STP for sewage plus a separate ETP for lab, OT and laundry effluent.

Industries

Staff sewage from factories and campuses, kept apart from process effluent.

Schools and colleges

Sized on students, staff and hostels, with garden reuse.

How to size your STP

Daily sewage (KLD) = users × water use per person per day × 0.8 ÷ 1,000. The 0.8 is the share of water that returns as sewage (CPHEEO design basis). Water use figures from NBC 2016:

BuildingWater useExampleSewageStarting plant size
Apartments135 litres per resident100 flats × 5 residents54 KLD60 KLD
Hotels180 litres per bed120 beds + 50 staff at 45 litresabout 19 KLD20–25 KLD
Hospitals over 100 beds450 litres per bed200 beds72 KLD75–80 KLD, plus an ETP
Offices and IT parks45 litres per person2,000 staff72 KLD75–80 KLD
Day schools and colleges45 litres per person1,500 students and staff54 KLD60 KLD

More: STP capacity calculation · packaged STP guide · capacity calculator

TNPCB approvals and rules

MoEFCC’s environmental conditions for building bye-laws (9 December 2016) set the national baseline: buildings of 20,000 sq m and more must treat 100% of their wastewater on site and reuse it for landscaping, flushing and cooling towers, and buildings of 5,000 to 20,000 sq m need on-site treatment where no municipal sewer is available. The Tamil Nadu Pollution Control Board gives the Consent to Establish (before construction) and the Consent to Operate (before the plant runs) and sets the outlet limits. Share the HECS layout and plant specifications with your consultant for the applications.

Read: TNPCB STP guidelines · is an STP mandatory? · NGT outlet norms

HECS projects in Tamil Nadu

  • 10 KLD packaged STP, Kalaignar Memorial, Chennai: design, supply, installation and commissioning, without disturbing daily visitors. Case study.
  • 10 KLD MBBR STP, MCC School, Chennai: an above-ground FRP plant with a below-ground collection tank for a hostel of about 80 students; treated water is reused for gardening. Case study.

See all completed HECS projects.

HECS 10 KLD packaged STP at the Kalaignar Memorial, Chennai
10 KLD · Kalaignar Memorial, Chennai
10 KLD Packaged STP at MCC School
10 KLD · MCC School, Chennai
STP in chennai
HECS packaged STP in Chennai
HECS packaged FRP treatment plants at the HECS factory
FRP packaged units at the HECS factory

What affects the cost of an STP in Tamil Nadu

  • Capacity: daily and peak flow (KLD).
  • Technology: MBBR or MBR, and the treated-water quality you need.
  • Reuse: filtration and disinfection for flushing, gardens or cooling.
  • Installation: above ground, or below ground with excavation.
  • Automation: PLC controls and IoT monitoring.
  • Site work: base or pit, pipelines, power supply and access.
  • After-sales: O&M or AMC after commissioning.

There is no fixed price list; see STP plant cost in India for how quotes are built and compared.

From enquiry to a running plant

  1. Send your details: building type, users or flats, location, space, and reuse plans.
  2. Sizing and layout: an HECS engineer confirms capacity, technology and an above- or below-ground layout.
  3. Factory build: the FRP unit is built and tested at Sriperumbudur.
  4. Site preparation: base or pit, inlet and outlet levels, and power, by the HECS civil team or, if you prefer, your own contractor.
  5. Delivery and installation: placing, piping, blowers and control panel.
  6. Commissioning and handover: biological start-up and operator training.
  7. After handover: O&M or AMC with HECS SmartHub monitoring.

Guide: STP installation and commissioning.

After installation: O&M, AMC and SmartHub

Packaged plants still need daily checks of blowers, pumps and dosing, regular sludge removal and periodic cleaning. HECS offers O&M and AMC contracts, and HECS SmartHub sends alerts so a stopped blower or pump is caught early. If a plant has problems, see STP troubleshooting and why an STP smells.

10 KLD Sewage Treatment Plant -MCC School
Checking the control panel on the MCC School 10 KLD STP, Chennai
Packaged STP in chennai
HECS packaged STP in Chennai

Contact HECS in Chennai

Head office: A21, 3rd Phase, TVK Industrial Estate, Guindy, Chennai 600032, Tamil Nadu
Phone: +91 73580 51767
WhatsApp: +91 84388 64070
Email: [email protected]

Send your building type, users or KLD and location, and our team replies within minutes. Projects in Chennai: see also packaged STP in Chennai.

FAQs

STP plant manufacturer in Tamil Nadu: FAQs

Can’t find your answer? Ask an HECS engineer. We reply within minutes.

Choose a manufacturer that designs, builds, installs and maintains the plant, so one company answers for its performance, and ask to see plants of a similar size. HECS (Hubert Enviro Care Systems) has worked in sewage treatment since 1997, is based in Guindy, Chennai, and builds its FRP packaged STPs at its factory in Sriperumbudur. Use our 12-question buyer checklist.

For larger buildings, yes. Under MoEFCC’s December 2016 building conditions, buildings of 20,000 sq m or more must treat 100% of their sewage on site and reuse it, and buildings of 5,000 to 20,000 sq m need on-site treatment where there is no municipal sewer. Your building approval and TNPCB consent set the exact rules. See is an STP mandatory?.

Daily sewage (KLD) = users × litres per person per day × 0.8 ÷ 1,000. A 100-flat block with 5 residents per flat at 135 litres a day makes about 54 KLD, so a 60 KLD plant is a sensible start. Use our capacity calculator.

MBBR (HECS Ultima) suits most apartments, schools, offices and factory sewage. MBR (HECS Amaze) suits sites that reuse water for flushing or cooling, have strict outlet limits or very little space. See MBBR vs MBR vs SBR.

A HECS Ultima unit is installed in about two days once the base or pit is ready, because it arrives factory-built and tested. Design approval, fabrication and commissioning add to this; from order to commissioning typically takes 4–6 weeks.

Usually a Consent to Establish before construction and a Consent to Operate before the plant runs. The CTO application usually needs treated-water test results from a recognised laboratory, which the owner arranges. See our TNPCB STP guidelines.

Yes. HECS packaged STPs install above or below ground. Below-ground units sit in a pit with a base and anchoring designed for the groundwater level, with access covers and the control panel above ground.

Yes, for toilet flushing, landscaping and cooling towers, after filtration and disinfection. At MCC School, Chennai, treated water from the 10 KLD HECS STP is reused for gardening. See treated sewage water reuse.

Yes. HECS is based in Chennai and offers O&M and AMC contracts, with HECS SmartHub remote monitoring that sends alerts when something needs attention.

The price depends on capacity, technology, reuse treatment, above- or below-ground installation and site work. See our STP plant cost guide, or send your details for a quotation.

Get your STP sized and quoted

Tell us the building type, users or flats, location and reuse plans. Our team replies within minutes.

STP Plant Manufacturer in Tamil Nadu