In short: a 500 KLD sewage treatment plant treats 5,00,000 litres of sewage a day. That is about 4,630 residents (roughly 926 flats), using NBC 2016 water figures. HECS supplies factory-built FRP packaged STPs at this capacity as one or more modules, with MBBR (HECS Ultima) or MBR (HECS Amaze) treatment, installed above or below ground, typically 4 to 6 weeks from order to commissioning.
Sewage treated per day
Residents (NBC 2016)
FRP ETP at ONGC Gopavaram
Packaged STP range
Who a 500 KLD STP suits
Approximate users for 500 KLD, using NBC 2016 water use per person and sewage at 80% of water:
| Building type | Water use (NBC 2016) | Approx. users for 500 KLD |
|---|---|---|
| Apartments and housing | 135 L per person a day | 4,630 residents (~926 flats) |
| Offices and IT parks | 45 L per person a day | 13,889 staff |
| Day schools and colleges | 45 L per student a day | 13,889 students |
| Hotels (with lodging) | 180 L per bed a day | 3,472 beds (plus staff) |
| Hospitals | 450 L per bed a day (over 100 beds) | 1,389 beds |
These are first estimates. Use the capacity calculator or read how to calculate STP capacity, and HECS confirms the final size after checking peak flow. Other sizes: 10 KLD, 20 KLD, 30 KLD, 50 KLD, 100 KLD, 200 KLD.
MBBR or MBR at 500 KLD
| HECS Ultima (MBBR) | HECS Amaze (MBR) | |
|---|---|---|
| Best for | Apartments, schools, offices and factories with typical discharge or garden reuse | Sites that reuse water for flushing or cooling, have strict limits or little space |
| Treated water | Meets typical discharge limits with filtration and disinfection | High clarity, suited to non-potable reuse |
| Body | Leak-proof FRP | Compact FRP unit |
| Monitoring | IoT remote monitoring with HECS SmartHub | IoT-enabled monitoring and control |
Compare them in MBBR vs MBR vs SBR, or see FRP vs RCC STP.
What is included
- Design and sizing by HECS engineers, with layout for above- or below-ground installation.
- Factory-built FRP modules, built and tested at the HECS factory near Chennai.
- Civil work (base or pit) by the HECS team, or by the client if preferred.
- Installation and commissioning, typically 4 to 6 weeks from order.
- HECS SmartHub remote monitoring, with O&M and AMC options.
Footprint, power rating and price are confirmed in the layout and quotation for your site.
Real HECS projects in this size range
- 1 MLD (1,000 KLD) FRP-based ETP at the ONGC field, Gopavaram, Andhra Pradesh: HECS’s larger-capacity FRP work. Case study
- 100 KLD packaged STP for SIDCGL at Alto Porvorim, Goa: installed below ground under a landscaped garden; operated by HECS under a 10-year O&M contract. Case study
Other packaged STP sizes
Not sure 500 KLD is right? Compare other HECS packaged STP capacities, or use the sewage calculator to size your plant.
500 KLD packaged STP: FAQs
Can’t find your answer? Ask an HECS engineer. We reply within minutes.
How many people does a 500 KLD STP serve?
About 4,630 residents (roughly 926 flats at 5 people each), using NBC 2016’s 135 litres per person a day and sewage at 80% of water use. Offices and day schools use far less water per person, so the same plant serves about 13,889 staff or students.
Should I buy exactly 500 KLD?
Size on your real daily flow plus a margin for peaks and growth. If your calculation lands close to 500 KLD, HECS checks peak hours, future expansion and reuse plans before recommending the next size up or down.
How much does a 500 KLD packaged STP cost?
There is no fixed price list. The price depends on technology (MBBR or MBR), treated-water quality, above- or below-ground installation, civil scope and automation. HECS sends a quotation after sizing; see the STP cost guide for what drives the price.
How long does installation take?
Order to commissioning typically takes 4 to 6 weeks. Civil work (base or pit) is done by the HECS team, or by the client if preferred. Larger plants built as several modules are scheduled module by module in the project plan.
How much space and power does a 500 KLD plant need?
Footprint and power depend on the model, technology and layout chosen for your site. HECS confirms the exact space, power rating and electrical load in the layout and quotation.
Is a packaged STP practical at 500 KLD?
Yes, as a set of factory-built FRP modules. HECS packaged plants cover 1 to 1,000 KLD, and larger capacities are split into modules that are installed side by side. This keeps civil work small and lets capacity grow with occupancy.
Who usually needs 500 KLD?
Townships and large gated communities (about 925 flats), large hospital campuses, universities, IT parks and industrial estates. HECS checks peak flow and reuse demand before fixing the module count.
Get a 500 KLD packaged STP quote
Share your building type, number of users or flats, location and reuse plans. Our team replies within minutes.