In short: HECS (Hubert Enviro Care Systems), a Chennai manufacturer since 1997, supplies factory-built FRP packaged sewage treatment plants (STPs) for apartments, hotels, hospitals, schools, offices and factories in Bengaluru (Bangalore) and across Karnataka, including Mysuru, Mangaluru, Hubballi-Dharwad and Belagavi. Each plant is designed to the outlet limits in your KSPCB consent, and typically commissioned 4 to 6 weeks from order. Bengaluru is a day’s road trip from the HECS factory near Chennai, which keeps delivery and service simple.
Hubert Enviro Care Systems
Packaged STP range
Order to commissioning
HECS SmartHub monitoring
Rules in Karnataka
- Karnataka: the Karnataka State Pollution Control Board (KSPCB) issues Consent to Establish and Consent to Operate. See KSPCB STP norms.
- Bengaluru apartments: many apartment complexes and tech parks must run an on-site STP and reuse treated water; your building approval and consent conditions set the details.
- Building size: MoEFCC’s 2016 building conditions require on-site treatment for larger buildings; see is an STP mandatory?.
This is a general guide, not legal advice. Share your consent conditions and HECS designs the plant to them.
Where packaged STPs fit in Karnataka
- Bengaluru apartments and gated communities: compact units above or below ground, with treated water for gardens and flushing.
- Tech parks, offices and hospitals: steady daily flows; MBR where reuse quality matters.
- Industrial areas (Peenya, Bommasandra, Hosakote, Mysuru and Hubballi-Dharwad): staff sewage alongside an ETP for process effluent; see STP vs ETP vs CETP.
- Resorts and hotels (Coorg, Chikkamagaluru, coastal Karnataka): plants sized for seasonal peaks.
- Construction sites and labour camps: a unit that can move to the next site; see STPs for construction sites.
Common sizes: 10 KLD, 20 KLD, 30 KLD, 50 KLD, 100 KLD, 200 KLD, 500 KLD.
Why HECS for Karnataka
- Since 1997: Hubert Enviro Care Systems designs and builds water and wastewater plants, with packaged STPs from 1 to 1,000 KLD.
- Close to Karnataka: the HECS factory near Chennai is a day’s road trip from Bengaluru, and HECS’s portfolio already covers South Indian sites including Bangalore, Hyderabad, Chennai, Goa and Kerala.
- Factory-built FRP: leak-proof, corrosion-resistant units built and tested before dispatch, so site work is short.
- Civil work your way: done by the HECS team, or by the client if preferred.
- Remote monitoring: HECS SmartHub alerts, with O&M and AMC options. See HECS projects.
Choose the technology
| HECS Ultima (MBBR) | HECS Amaze (MBR) | |
|---|---|---|
| Best for | Apartments, schools, offices and factories with typical discharge or garden reuse | Sites that reuse water for flushing or cooling, have strict limits or little space |
| Treated water | Meets typical discharge limits with filtration and disinfection | High clarity, suited to non-potable reuse |
| Body | Leak-proof FRP | Compact FRP unit |
| Monitoring | IoT remote monitoring with HECS SmartHub | IoT-enabled monitoring and control |
How a project runs
- Share your site details: building type, users or KLD, location, space and reuse plans.
- Sizing and layout: an HECS engineer confirms capacity, technology and the above- or below-ground layout.
- Factory build: the FRP unit is built and tested at the HECS factory near Chennai.
- Transport: the finished unit travels by road to your site in Karnataka.
- Civil work: the base or pit is prepared by the HECS team, or by the client if preferred.
- Installation and commissioning: typically 4 to 6 weeks from order to commissioning.
- Monitoring and service: HECS SmartHub alerts, with O&M and AMC options.
Packaged STP in Karnataka: FAQs
Can’t find your answer? Ask an HECS engineer. We reply within minutes.
Do you supply packaged STPs in Bengaluru (Bangalore)?
Yes. HECS supplies factory-built FRP packaged STPs for sites in Bengaluru (Bangalore) and across Karnataka. Send your building type, users or KLD and location on WhatsApp, and an HECS engineer will size the plant.
Which pollution control board applies?
The Karnataka State Pollution Control Board (KSPCB) issues Consent to Establish and Consent to Operate under the Water Act. Your consent sets the outlet limits, and HECS designs the plant to them.
Is an STP mandatory for apartments in Bengaluru?
Large buildings must have one. Under MoEFCC’s December 2016 building conditions, buildings of 20,000 sq m or more must treat all their sewage on site and reuse it, and buildings of 5,000 to 20,000 sq m need on-site treatment where there is no sewer. Your building approval and consent set the exact rules; see is an STP mandatory?.
How long does installation take?
Order to commissioning typically takes 4 to 6 weeks. A HECS Ultima unit is installed in about two days once the base or pit is ready. Civil work is done by the HECS team, or by the client if preferred.
Can treated water be reused?
Yes, for gardens, toilet flushing and cooling, after filtration and disinfection. Read reusing treated sewage water.
Who do I contact for Karnataka?
HECS’s South India enquiries team: +91 91500 41791 or +91 84388 64185, or WhatsApp +91 84388 64070.
Plan a packaged STP in Karnataka
Share the building type, users or KLD, location and reuse plans. Our team replies within minutes.
