Packaged STP in Delhi NCR

In short: HECS (Hubert Enviro Care Systems), a Chennai manufacturer since 1997, supplies factory-built FRP packaged sewage treatment plants (STPs) for apartments, hotels, hospitals, schools, offices and factories in Delhi, Gurugram, Noida, Greater Noida, Ghaziabad and Faridabad. Each plant is designed to the outlet limits in your DPCC, HSPCB or UPPCB consent, and typically commissioned 4 to 6 weeks from order.

✓ DPCC, HSPCB, UPPCB✓ Delhi, Gurugram, Noida✓ Above or below ground
Illustration: HECS packaged FRP STP at an office and housing campus in Delhi NCR
Illustration: HECS packaged FRP STP at an office campus in Delhi NCR
Since 1997

Hubert Enviro Care Systems

1–1,000 KLD

Packaged STP range

4–6 weeks

Order to commissioning

IoT

HECS SmartHub monitoring

Rules in Delhi NCR

  • Delhi: the Delhi Pollution Control Committee (DPCC) issues consents.
  • Gurugram and Faridabad (Haryana): the Haryana State Pollution Control Board (HSPCB).
  • Noida, Greater Noida and Ghaziabad (Uttar Pradesh): the Uttar Pradesh Pollution Control Board (UPPCB).
  • Building size: MoEFCC’s 2016 building conditions require on-site treatment for larger buildings; see is an STP mandatory?.

This is a general guide, not legal advice. Share your consent conditions and HECS designs the plant to them.

Where packaged STPs fit in Delhi NCR

  • Group housing in Gurugram, Noida and Ghaziabad: units above or below ground, with treated water for gardens and flushing.
  • Offices, malls, hospitals and institutions in Delhi: compact MBR units where space is tight and reuse quality matters.
  • Industrial areas (Manesar, Okhla, Noida and Faridabad): staff sewage alongside an ETP for process effluent; see STP vs ETP vs CETP.
  • Hotels, farmhouses and banquet venues: plants sized for event-day peaks.
  • Construction sites and labour camps: a unit that can move to the next site; see STPs for construction sites.

Common sizes: 10 KLD, 20 KLD, 30 KLD, 50 KLD, 100 KLD, 200 KLD, 500 KLD.

Why HECS for Delhi NCR

  • Since 1997: Hubert Enviro Care Systems designs and builds water and wastewater plants, with packaged STPs from 1 to 1,000 KLD.
  • Factory-built FRP: leak-proof, corrosion-resistant units built and tested before dispatch, so site work is short.
  • Civil work your way: done by the HECS team, or by the client if preferred.
  • Remote monitoring: HECS SmartHub alerts, with O&M and AMC options. See HECS projects.
  • Delivered by road: finished FRP units travel from the HECS factory near Chennai to sites across Delhi NCR; transport is planned in the quotation.

Choose the technology

HECS Ultima (MBBR)HECS Amaze (MBR)
Best forApartments, schools, offices and factories with typical discharge or garden reuseSites that reuse water for flushing or cooling, have strict limits or little space
Treated waterMeets typical discharge limits with filtration and disinfectionHigh clarity, suited to non-potable reuse
BodyLeak-proof FRPCompact FRP unit
MonitoringIoT remote monitoring with HECS SmartHubIoT-enabled monitoring and control

How a project runs

  1. Share your site details: building type, users or KLD, location, space and reuse plans.
  2. Sizing and layout: an HECS engineer confirms capacity, technology and the above- or below-ground layout.
  3. Factory build: the FRP unit is built and tested at the HECS factory near Chennai.
  4. Transport: the finished unit travels by road to your site in Delhi NCR.
  5. Civil work: the base or pit is prepared by the HECS team, or by the client if preferred.
  6. Installation and commissioning: typically 4 to 6 weeks from order to commissioning.
  7. Monitoring and service: HECS SmartHub alerts, with O&M and AMC options.
Residential packaged sewage treatment plant
HECS FRP packaged STP at the HECS factory near Chennai
FAQs

Packaged STP in Delhi NCR: FAQs

Can’t find your answer? Ask an HECS engineer. We reply within minutes.

Yes. HECS supplies factory-built FRP packaged STPs for sites in Delhi, Gurugram and Noida and across Delhi NCR. Send your building type, users or KLD and location on WhatsApp, and an HECS engineer will size the plant.

It depends on where the site is. In Delhi, the Delhi Pollution Control Committee (DPCC). In Gurugram and Faridabad, the Haryana State Pollution Control Board (HSPCB). In Noida, Greater Noida and Ghaziabad, the Uttar Pradesh Pollution Control Board (UPPCB). Your consent sets the outlet limits, and HECS designs the plant to them.

Large buildings must have one. Under MoEFCC’s December 2016 building conditions, buildings of 20,000 sq m or more must treat all their sewage on site and reuse it, and buildings of 5,000 to 20,000 sq m need on-site treatment where there is no sewer. Your building approval and consent set the exact rules; see is an STP mandatory?.

Order to commissioning typically takes 4 to 6 weeks. A HECS Ultima unit is installed in about two days once the base or pit is ready. Civil work is done by the HECS team, or by the client if preferred.

Yes, for gardens, toilet flushing and cooling, after filtration and disinfection. Read reusing treated sewage water.

HECS’s North India enquiries team (Delhi, Haryana, Uttar Pradesh and nearby): +91 99525 91074, or WhatsApp +91 84388 64070. Our team replies within minutes.

Plan a packaged STP in Delhi NCR

Share the building type, users or KLD, location and reuse plans. Our team replies within minutes.

Packaged Sewage Treatment Plant in Delhi NCR